We are proud to introduce you to our new manufacturing plant and offices in Schio (Vicenza, Italy).

• Construction completed in 2020, fully operational since April 2021
• 5.600 sqm workshop area, exclusively dedicated to welding exotic materials and therefore without carbon steel contamination
• Total area 10.200 sqm
• More than 30 Ton lifting capacity per line
• 11 cranes with 15 / 20 Ton capacity
• 3 working lines
• Tallest line: 8,5 mt below the crane hook

TOP