We are proud to introduce you to our new manufacturing plant and offices in Schio (Vicenza, Italy).

  • Construction completed in 2020, fully operational since April 2021
  • 5.600 sqm workshop area, exclusively dedicated to welding exotic materials and therefore without carbon steel contamination
  • Total area 10.200 sqm
  • More than 30 Ton lifting capacity per line
  • 11 cranes with 15/20 Ton capacity
  • 3 working lines
  • Tallest line: 8,5 mt below the crane hook